Location: DeBeers Gahcho Kue, NWT.
Supply and installation of the structure and building envelope for the Truck Shop and Emulsion Buildings. Supply and installation of the building envelope for the production building.
Location: DeBeers Gahcho Kue, NWT.
Supply and installation of the structure and building envelope for the Truck Shop and Emulsion Buildings. Supply and installation of the building envelope for the production building.
Location: Trailer Wizards, Delta BC.
LoadPath was called on again by Trailer Wizards to Design- Building the second phase addition to their truck facility. LoadPath provided service as the General Contractor of the new 14,000 sq.ft. Second Phase Building Addition.
Location: SeaSpan, North Vancouver, British Columbia
32,000 sq.ft Mobile Rain Shelter. The building is designed to cover ships under construction. The shelter is capable of multiple roof height adjusts to accommodate different ship sizes. The building is moved by the 300 ton gantry crane on the SeaSpan site.
Location: Abbotsford, British Columbia
Congratulations to Lally Farms and all their success. LoadPath was happy to supply and install another 20,000 SF berry processing plant.
Location: Toba Inlet, British Columbia
LoadPath supplied and installed this 8,600 sq. ft. Jimmie Creek Run-of-River Powerhouse housing an 80ton bridge crane for servicing the generator.
Location: Horsey Substation, Victoria, BC
This 6,000 sq. ft. structure houses the new switchgear for the main power transmission for Victoria. Designed and fabricated in the fall of 2014 and substantially completed in March of 2015. LoadPath completed this small yet complex project in a tight schedule on a BC Hydro active transmission site.
Location: Canfor Pulp Mill, Prince George, BC
This 3,000 sq. ft. structure housing two rail cars for the Canfor Pulp Mill. Designed and fabricated in February of 2015 and substantially completed in May of 2015. LoadPath performed this work for Canfor Pulp directly.
LoadPath is once again back up at Copper Mountain Mine, selected to construct the latest mine building, a 4,000 sq.ft. x 110 ft tall Coarse Ore Stockpile Feed – Primary Crusher building.
Taseko Mines with All North Consulting – Supply and Install of a new Truck Shop. 25,000 sq.ft.
This Gibraltar Mine’s phase 3 expansion includes a new processing plant. LoadPath worked through a detailed design phase, collaborating closely with Ausenco Engineering to complete this very large project through the winter and have the building complex ready for Spring 2012. Total constructed works by LoadPath exceeded $20 Million and included conventional structural steel in various interior portions of the project.