Call Us Today! 604.294.9191|info@loadpath.ca
  • Gahcho Kue Diamond Mine Gahcho Kue Diamond Mine

    Gahcho Kue Diamond Mine

Gahcho Kue Diamond Mine

Location: DeBeers Gahcho Kue, NWT.

Supply and installation of the structure and building envelope for the Truck Shop and Emulsion Buildings. Supply and installation of the building envelope for the production building.

By |August 12th, 2016||Comments Off on Gahcho Kue Diamond Mine
  • Trailer Wizards Second Phase Building Addition Trailer Wizards Second Phase Building Addition

    Trailer Wizards Second Phase Building Addition

Trailer Wizards Second Phase Building Addition

Location: Trailer Wizards, Delta BC.

LoadPath was called on again by Trailer Wizards to Design- Building the second phase addition to their truck facility. LoadPath provided service as the General Contractor of the new 14,000 sq.ft. Second Phase Building Addition.

By |January 12th, 2016||Comments Off on Trailer Wizards Second Phase Building Addition
  • SeaSpan Mobile Rain Shelter SeaSpan Mobile Rain Shelter

    SeaSpan Mobile Rain Shelter

SeaSpan Mobile Rain Shelter

Location: SeaSpan, North Vancouver, British Columbia

32,000 sq.ft Mobile Rain Shelter. The building is designed to cover ships under construction. The shelter is capable of multiple roof height adjusts to accommodate different ship sizes. The building is moved by the 300 ton gantry crane on the SeaSpan site.

By |January 12th, 2016||Comments Off on SeaSpan Mobile Rain Shelter
  • Lally Farms – Second Berry Processing Facility Lally Farms – Second Berry Processing Facility

    Lally Farms – Second Berry Processing Facility

Lally Farms – Second Berry Processing Facility

Location: Abbotsford, British Columbia

Congratulations to Lally Farms and all their success. LoadPath was happy to supply and install another 20,000 SF berry processing plant.

 

By |January 12th, 2016||Comments Off on Lally Farms – Second Berry Processing Facility
  • Jimmie Creek Run-of-River Powerhouse Jimmie Creek Run-of-River Powerhouse

    Jimmie Creek Run-of-River Powerhouse

Jimmie Creek Run-of-River Powerhouse

Location: Toba Inlet, British Columbia

LoadPath supplied and installed this 8,600 sq. ft. Jimmie Creek Run-of-River Powerhouse housing an 80ton bridge crane for servicing the generator.

By |January 12th, 2016||Comments Off on Jimmie Creek Run-of-River Powerhouse
  • Horsey Substation Horsey Substation

    Horsey Substation

Horsey Substation

Location: Horsey Substation, Victoria, BC 

This 6,000 sq. ft. structure houses the new switchgear for the main power transmission for Victoria.  Designed and fabricated in the fall of 2014 and substantially completed in March of 2015.  LoadPath completed this small yet complex project in a tight schedule on a BC Hydro active transmission site.

 

By |January 12th, 2016||Comments Off on Horsey Substation
  • Canfor Rail Car Unloading Canfor Rail Car Unloading

    Canfor Rail Car Unloading

Canfor Rail Car Unloading

Location: Canfor Pulp Mill, Prince George, BC

This 3,000 sq. ft. structure housing two rail cars for the Canfor Pulp Mill.  Designed and fabricated in February of 2015 and substantially completed in May of 2015.  LoadPath performed this work for Canfor Pulp directly.

By |January 12th, 2016||Comments Off on Canfor Rail Car Unloading
  • Copper Mountain Mine – Primary Crusher Building Copper Mountain Mine – Primary Crusher Building

    Copper Mountain Mine – Primary Crusher Building

Copper Mountain Mine – Primary Crusher Building

LoadPath is once again back up at Copper Mountain Mine, selected to construct the latest mine building, a 4,000 sq.ft. x 110 ft tall Coarse Ore Stockpile Feed – Primary Crusher building.

By |April 5th, 2014||Comments Off on Copper Mountain Mine – Primary Crusher Building
  • Gibraltar Mine – Truck Shop Gibraltar Mine – Truck Shop

    Gibraltar Mine – Truck Shop

Gibraltar Mine – Truck Shop

Taseko Mines with All North Consulting – Supply and Install of a new Truck Shop. 25,000 sq.ft.

By |April 4th, 2014||Comments Off on Gibraltar Mine – Truck Shop
  • Gibraltar Mine – Grinding/Flotation/Tailings Buildings Gibraltar Mine – Grinding/Flotation/Tailings Buildings

    Gibraltar Mine – Grinding/Flotation/Tailings Buildings

Gibraltar Mine – Grinding/Flotation/Tailings Buildings

This Gibraltar Mine’s phase 3 expansion includes a new processing plant. LoadPath worked through a detailed design phase, collaborating closely with Ausenco Engineering to complete this very large project through the winter and have the building complex ready for Spring 2012. Total constructed works by LoadPath exceeded $20 Million and included conventional structural steel in various interior portions of the project.

By |April 3rd, 2014||Comments Off on Gibraltar Mine – Grinding/Flotation/Tailings Buildings