Call Us Today! 604.294.9191|info@loadpath.ca
  • Teck Quintette Mine – Truck Shop Teck Quintette Mine – Truck Shop

    Teck Quintette Mine – Truck Shop

Teck Quintette Mine – Truck Shop

Eight bay truck shop with wash bay and maintenance shop. Design-build turn-key. IDL Projects is the project General Contractor, with LoadPath providing design, supply and install of the steel structures. (In progress)

By |April 2nd, 2014||Comments Off on Teck Quintette Mine – Truck Shop
  • Trailer Wizards, Maintenance Shop Addition Trailer Wizards, Maintenance Shop Addition

    Trailer Wizards, Maintenance Shop Addition

Trailer Wizards, Maintenance Shop Addition

19,500 sq.ft. Maintenance shop addition and renovation of existing building.

By |April 1st, 2014||Comments Off on Trailer Wizards, Maintenance Shop Addition
  • North Battleford Energy Centre – Warehouse #2 North Battleford Energy Centre – Warehouse #2

    North Battleford Energy Centre – Warehouse #2

North Battleford Energy Centre – Warehouse #2

A free-standing 5,000 sq. ft. building to provide additional warehousing at the North Battleford power generating plant. This building was completed in 2012 on a design-build turn-key basis for Northland Power, under Kiewit Construction.  LoadPath’s scope of work included civil, foundations, electrical and mechanical.

By |March 31st, 2014||Comments Off on North Battleford Energy Centre – Warehouse #2
  • Wolverine Mine – Yukon Zinc Company Wolverine Mine – Yukon Zinc Company

    Wolverine Mine – Yukon Zinc Company

Wolverine Mine – Yukon Zinc Company

Acting in a key alliance partnership with Yukon Zinc Corporation, Garco Buildings Systems invited LoadPath, with its partner Still Creek Engineering, to provide assistance with engineering, detailed design and procurement of the many required building components. The assignment included 3 heavy industrial structures: a 60,000 sq. ft. Mill Building supporting 25, 10 and 5 tonne bridge cranes; a 25,000 sq. ft. Concentrate Loadout Building and a 6,000 sq. ft. Crusher Building with 5 tonne crane. Wardrop Engineering was the project prime consultant.

By |March 30th, 2014||Comments Off on Wolverine Mine – Yukon Zinc Company
  • Copper Mountain Mine – Concentrator Building Copper Mountain Mine – Concentrator Building

    Copper Mountain Mine – Concentrator Building

Copper Mountain Mine – Concentrator Building

This 120,000 sq. ft. mine production building was completed in 2010 and supports 50/10 tonne and 15 tonne bridge cranes. LoadPath partnered with Garco Buildings on this project to design, supply and erect this heavy industrial building structure.  LoadPath worked under the direction of Merit Consultants and Hatch Engineers, who were the prime consultants responsible for the construction of the Copper Mountain Mine project.

The Journal of Commerce did an article on LoadPath’s contribution to the Copper Mountain Mine. Read the article HERE.

By |March 30th, 2014||Comments Off on Copper Mountain Mine – Concentrator Building
  • Gibraltar Mine – Moly Filtration Building Gibraltar Mine – Moly Filtration Building

    Gibraltar Mine – Moly Filtration Building

Gibraltar Mine – Moly Filtration Building

This 16,000 sq. ft. structure will enclose the mine’s expanded moly filtration process.  Designed and fabricated summer 2011, the building structure was substantially completed in November 2011.  LoadPath worked under Ausenco Engineering to complete the project.

By |March 30th, 2014||Comments Off on Gibraltar Mine – Moly Filtration Building
  • BC Hydro Kokish River Substation- Control Building BC Hydro Kokish River Substation- Control Building

    BC Hydro Kokish River Substation- Control Building

BC Hydro Kokish River Substation- Control Building

Supply and install of the BC Hydro Control Building – 1,300 sq. ft.

By |March 30th, 2014||Comments Off on BC Hydro Kokish River Substation- Control Building
  • Haa-ak-suuk Powerhouse Haa-ak-suuk Powerhouse

    Haa-ak-suuk Powerhouse

Haa-ak-suuk Powerhouse

Haa-ak-suuk Creek Hydro Limited Partnership Supply of a new Powerhouse Building 2,600 sq. ft.

By |March 30th, 2014||Comments Off on Haa-ak-suuk Powerhouse
  • Tolko – Log Pond Upgrade Tolko – Log Pond Upgrade

    Tolko – Log Pond Upgrade

Tolko – Log Pond Upgrade

Tolko Industries LTD. Athabasca Division, Reconstruction of the existing Log Pond building at Tolko Athabasca, raising the roof by 30ft to accommodate a new Tanguay Grapple at the mill in-feed.

By |March 30th, 2014||Comments Off on Tolko – Log Pond Upgrade
  • Trailer Wizards Inspection Building Enclosure Trailer Wizards Inspection Building Enclosure

    Trailer Wizards Inspection Building Enclosure

Trailer Wizards Inspection Building Enclosure

LoadPath teamed up with Still Creek Engineering to refurbish and add walls to this existing 30,000 sq.ft. open storage building so that it could be converted into a trailer inspection facility.

By |March 30th, 2014||Comments Off on Trailer Wizards Inspection Building Enclosure